5KW 3 PHASE 400V
• Remember to indicate in your order whether you will have your own products with you, so that we can advise you on the amount and type of electricity required.
• Consumption and installation of double power sockets on the floor are included in the order for electricity. All power sockets are led back to the same point, which will be positioned in the storage room or the innermost corner of the stand.
• Connection of power supply above 63 A/400 V, 230 V 3-phase, 24-hour 3-phase or outside the permanent exhibition halls must be done with dedicated cables, and will be invoiced on the basis of the time and materials used. A 25 per cent supplement is charged for 24-hour one-phase power supply.
• Prices for lighting do not include connection and consumption of electricity, with the exception of items 4100 where connection and consumption are included.
• When installing your own equipment, you are solely responsible for ensuring that it is CE-approved and installed by a Norwegian-registered electrician.
If your stand have no walls, please send a drawing to service@novaspektrum.no after ordering. Include your order number when contacting us, so we can help you faster.
If you need electricity outside the opening hours of the exhibition, be sure to add 24-hour electricity to your order.
(Unless the organisers of the exhibition you're participating at tells you otherwise, electricity is not provided in stand rental)